mcAfee Secure Website
exam =5
exam =6

Exam Code: 800-150

Exam Name: Supporting Cisco Devices for Field Technicians

Certification Provider: Cisco

Cisco 800-150 Questions & Answers

Reliable & Actual Study Materials for 800-150 Exam Success

100 Questions & Answers with Testing Engine

"800-150: Supporting Cisco Devices for Field Technicians" Testing Engine covers all the knowledge points of the real Cisco 800-150 exam.

The latest actual 800-150 Questions & Answers from Pass4sure. Everything you need to prepare and get best score at 800-150 exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Cisco Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Cisco 800-150 Practice Test 27

Question 260

Remote office replacement window. Field report: A supported IOS XE device boots through a `packages.conf` manifest. Which action is the most defensible first step?

  1. Assume unpackaged `.bin` file naming proves install packages are active.
  2. Configure an unrelated DNS record to install packages.
  3. Treat this as install mode and use the supported install workflow.
  4. Force bundle boot even when approved procedure requires install mode.

Explanation

Correct Answer

C:

Install mode boots extracted packages referenced by a package manifest. The action should lead to evidence that installed package state and boot path match the approved version.

Incorrect Answers

A:

Attempting this shortcut is not an adequate substitute for the required action. Install mode boots extracted packages referenced by a package manifest. Post-change evidence is still needed.

B:

This alternative would not solve the reported problem. Install mode boots extracted packages referenced by a package manifest. The field team must instead establish whether installed package state and boot path match the approved version.

D:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a supported ios xe device boots through a `packages.conf` manifest. The relevant control is treat this as install mode and use the supported install workflow.

Question 261

Disaster-recovery facility inspection. Field report: An application group receives virtual servers and networks but manages the guest OS. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Defer service verification after “Treat physical rack elevation drawings as the delivered application service” until the next reported incident.
  2. Apply “Assume hosted hardware makes the guest operating system someone else's responsibility by default” as a substitute and declare success from shipment receipt alone.
  3. Close after recording “Classify it as SaaS solely because management uses a browser” without checking that the customer is responsible for guest OS configuration and applications.
  4. Perform or retain the approved action: identify an iaas-style service boundary; document evidence that the customer is responsible for guest OS configuration and applications.

Explanation

Correct Answer

D:

This handoff preserves the required corrective action and the verifiable service outcome. IaaS exposes compute/network infrastructure while consumers commonly manage their own OS workloads. Recording that the customer is responsible for guest OS configuration and applications makes the signoff testable.

Incorrect Answers

A:

A future incident is not a reasonable acceptance gate for a known problem. “Treat physical rack elevation drawings as the delivered application service” is not evidence that the customer is responsible for guest OS configuration and applications.

B:

Delivery paperwork describes logistics, not recovered functionality. “Assume hosted hardware makes the guest operating system someone else's responsibility by default” leaves the technical requirement and its validation unresolved.

C:

This proposes a different action with no acceptance evidence. “Classify it as SaaS solely because management uses a browser” cannot replace the validated measure that the customer is responsible for guest OS configuration and applications.

Question 262

Main campus hardware-service ticket. Field report: A voice VLAN reaches one switch but not another through an 802.1Q uplink. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Demonstrate that the VLAN is carried end to end and MAC learning resumes.
  2. Confirm only that the technician attempted: replace the local dns record for the ip phone.
  3. Confirm only that the work ticket says “completed,” without testing trunk vlan allowed list.
  4. Confirm the site inventory list still contains the hostname, without validating the reported service.

Explanation

Correct Answer

A:

The VLAN is carried end to end and MAC learning resumes. A missing VLAN in a trunk allowed list prevents its frames traversing that link.

Incorrect Answers

B:

For example, “Replace the local DNS record for the IP phone” does not demonstrate the corrected technical state.

C:

Check whether the VLAN is carried end to end and MAC learning resumes. A missing VLAN in a trunk allowed list prevents its frames traversing that link.

D:

Confirm that the VLAN is carried end to end and MAC learning resumes. A missing VLAN in a trunk allowed list prevents its frames traversing that link.

Question 263

Regional north-campus service window. Field report: A suspected fiber loss requires measured signal levels. A colleague proposes: “Use a copper continuity tester as the sole laser receiver diagnostic.” Which technical assessment is best supported?

  1. There is no need to validate the reported dependency once rely only on a switch hostname to estimate dbm.
  2. The proposal overlooks the reported dependency: Optical power measurements and safe inspection reveal signal budget defects.
  3. The original problem can be treated as resolved from inventory labels alone, without checking optical test equipment behavior.
  4. The proposed shortcut is sufficient because look directly into an energized fiber to judge brightness.

Explanation

Correct Answer

B:

The alternative does not address the actual reported dependency. Optical power measurements and safe inspection reveal signal budget defects. The supported intervention is use a compatible optical power meter or supported dom readings and approved inspection; acceptance should show that measured receive power sits within the optic's supported range.

Incorrect Answers

A:

It assumes an unrelated action establishes service recovery. Nothing about “Rely only on a switch hostname to estimate dBm” demonstrates whether measured receive power sits within the optic's supported range.

C:

The failure described in the field report requires a functional check that measured receive power sits within the optic's supported range.

D:

The proposed step “Look directly into an energized fiber to judge brightness” is not the required mechanism.

Question 264

Customer branch-site maintenance. Field report: A Nexus management interface is reachable locally but not from the authorized management station. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm only that the work ticket says “completed,” without testing nx-os management vrf.
  2. Confirm the site inventory list still contains the hostname, without validating the reported service.
  3. Demonstrate that management routing and authorized station access via the intended VRF.
  4. Confirm only that the technician attempted: change unrelated storage vlan membership to route management traffic.

Explanation

Correct Answer

C:

Management routing and authorized station access via the intended VRF. Dedicated management VRF forwarding can differ from the main data-plane VRF.

Incorrect Answers

A:

Check whether management routing and authorized station access via the intended VRF.

B:

Confirm that management routing and authorized station access via the intended VRF.

D:

For example, “Change unrelated storage VLAN membership to route management traffic” does not demonstrate the corrected technical state.

Question 265

Primary data-center night shift. Field report: A new IP phone never boots on a switch port after the old model was removed. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Defer service verification after “Move the phone into a different DNS zone to supply electrical power” until the next reported incident.
  2. Apply “Remove SIP trunks to create additional PoE wattage” as a substitute and declare success from shipment receipt alone.
  3. Close after recording “Change UCM dial plans while the phone receives no power” without checking that supplied power meets device requirements and handset starts.
  4. Perform or retain the approved action: check power source or poe class/budget and physical cable before voice signaling; document evidence that supplied power meets device requirements and handset starts.

Explanation

Correct Answer

D:

This handoff preserves the required corrective action and the verifiable service outcome. Endpoint power is a prerequisite for network registration and calls. Recording that supplied power meets device requirements and handset starts makes the signoff testable.

Incorrect Answers

A:

A future incident is not a reasonable acceptance gate for a known problem. “Move the phone into a different DNS zone to supply electrical power” is not evidence that supplied power meets device requirements and handset starts.

B:

Delivery paperwork describes logistics, not recovered functionality. “Remove SIP trunks to create additional PoE wattage” leaves the technical requirement and its validation unresolved.

C:

This proposes a different action with no acceptance evidence. “Change UCM dial plans while the phone receives no power” cannot replace the validated measure that supplied power meets device requirements and handset starts.

Question 266

Headquarters wiring-closet visit. Field report: A desk phone has link but no network address after a wiring closet change. Which action is the most defensible first step?

  1. Check switch access, voice VLAN, power and DHCP for the phone.
  2. Change the upstream UCS storage zoning before phone address checks.
  3. Assume physical link alone guarantees voice signaling service.
  4. Replace the call-control cluster before confirming VLAN reachability.

Explanation

Correct Answer

A:

Endpoint voice service depends on correct network access and addressing. The action should lead to evidence that a valid voice address and registration once edge service is restored.

Incorrect Answers

B:

This alternative would not solve the reported problem. Endpoint voice service depends on correct network access and addressing. The field team must instead establish whether a valid voice address and registration once edge service is restored.

C:

Attempting this shortcut is not an adequate substitute for the required action. Endpoint voice service depends on correct network access and addressing. Post-change evidence is still needed.

D:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a desk phone has link but no network address after a wiring closet change. The relevant control is check switch access, voice vlan, power and dhcp for the phone.

Question 267

Colocation site RMA handoff. Field report: An ASR chassis has a failed redundant route processor while another remains active. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Close after recording “Remove both route processors at once to accelerate recovery” without checking that standby processor joins with the expected role and software state.
  2. Perform or retain the approved action: review active/standby health and supported processor replacement procedure before maintenance; document evidence that standby processor joins with the expected role and software state.
  3. Apply “Swap in an unapproved supervisor from a different chassis family” as a substitute and declare success from shipment receipt alone.
  4. Defer service verification after “Treat a power LED as proof of stateful redundancy” until the next reported incident.

Explanation

Correct Answer

B:

This handoff preserves the required corrective action and the verifiable service outcome. Modular router redundancy and control-plane switchover must be preserved during service. Recording that standby processor joins with the expected role and software state makes the signoff testable.

Incorrect Answers

A:

This proposes a different action with no acceptance evidence. “Remove both route processors at once to accelerate recovery” cannot replace the validated measure that standby processor joins with the expected role and software state.

C:

Delivery paperwork describes logistics, not recovered functionality. “Swap in an unapproved supervisor from a different chassis family” leaves the technical requirement and its validation unresolved.

D:

A future incident is not a reasonable acceptance gate for a known problem. “Treat a power LED as proof of stateful redundancy” is not evidence that standby processor joins with the expected role and software state.

Question 268

Remote office replacement window. Field report: An old UPS-backed network appliance includes a damaged battery pack. Which action is the most defensible first step?

  1. Store leaking batteries near conductive tools in a rack drawer.
  2. Put the damaged battery in ordinary paper waste.
  3. Follow site battery hazard and authorized disposal process.
  4. Short the terminals to discharge it quickly.

Explanation

Correct Answer

C:

Damaged battery packs require dedicated electrical and environmental handling. The action should lead to evidence that the battery was isolated and transferred under the approved process.

Incorrect Answers

A:

Attempting this shortcut is not an adequate substitute for the required action. Damaged battery packs require dedicated electrical and environmental handling. Post-change evidence is still needed.

B:

This alternative would not solve the reported problem. Damaged battery packs require dedicated electrical and environmental handling. The field team must instead establish whether the battery was isolated and transferred under the approved process.

D:

That change addresses a different aspect of the environment and leaves this requirement unresolved: an old ups-backed network appliance includes a damaged battery pack. The relevant control is follow site battery hazard and authorized disposal process.

Question 269

Disaster-recovery facility inspection. Field report: An accidental redundant Layer 2 patch makes the network unstable. A colleague proposes: “Turn off ARP on all workstations to eliminate all loops.” Which technical assessment is best supported?

  1. The original problem can be treated as resolved from inventory labels alone, without checking loop prevention behavior.
  2. There is no need to validate the reported dependency once install longer ethernet cables on the same loop.
  3. The proposed shortcut is sufficient because change radius shared secrets to repair bridge loops.
  4. The proposal overlooks the reported dependency: STP and approved topology controls keep redundant Layer 2 paths from forwarding in loops.

Explanation

Correct Answer

D:

The alternative does not address the actual reported dependency. STP and approved topology controls keep redundant Layer 2 paths from forwarding in loops. The supported intervention is inspect spanning-tree topology and remove the unauthorized loop safely; acceptance should show that topology stabilizes with correct STP port roles.

Incorrect Answers

A:

The failure described in the field report requires a functional check that topology stabilizes with correct STP port roles.

B:

It assumes an unrelated action establishes service recovery. Nothing about “Install longer Ethernet cables on the same loop” demonstrates whether topology stabilizes with correct STP port roles.

C:

The proposed step “Change RADIUS shared secrets to repair bridge loops” is not the required mechanism.

Question 270

Main campus hardware-service ticket. Field report: A converged data center uses separate management, production and storage fabrics. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Demonstrate that designated networks and service paths remain isolated as designed.
  2. Confirm only that the technician attempted: assume one management ip can carry every fabric's data securely by default.
  3. Confirm only that the work ticket says “completed,” without testing data center traffic isolation.
  4. Confirm the site inventory list still contains the hostname, without validating the reported service.

Explanation

Correct Answer

A:

Designated networks and service paths remain isolated as designed. Traffic classes with different security and operational needs require intentional segmentation.

Incorrect Answers

B:

For example, “Assume one management IP can carry every fabric's data securely by default” does not demonstrate the corrected technical state.

C:

Check whether designated networks and service paths remain isolated as designed.

D:

Confirm that designated networks and service paths remain isolated as designed.

Supporting Cisco Devices for Field Technicians (800-150) Practice Tests