mcAfee Secure Website
exam =5
exam =6

Exam Code: 800-150

Exam Name: Supporting Cisco Devices for Field Technicians

Certification Provider: Cisco

Cisco 800-150 Questions & Answers

Reliable & Actual Study Materials for 800-150 Exam Success

100 Questions & Answers with Testing Engine

"800-150: Supporting Cisco Devices for Field Technicians" Testing Engine covers all the knowledge points of the real Cisco 800-150 exam.

The latest actual 800-150 Questions & Answers from Pass4sure. Everything you need to prepare and get best score at 800-150 exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Cisco Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Cisco 800-150 Practice Test 15

Question 140

Regional north-campus service window. Field report: The spare must match a ticket's PID and serial number. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Apply “Use the interface description field as manufacturer PID evidence” as a substitute and declare success from shipment receipt alone.
  2. Perform or retain the approved action: capture `show inventory` and compare to physical and rma labels; document evidence that chassis PID, serial and relevant module identities match the replacement ticket.
  3. Defer service verification after “Infer the serial number from the connected VLAN ID” until the next reported incident.
  4. Close after recording “Trust the hostname as the unique chassis serial number” without checking that chassis PID, serial and relevant module identities match the replacement ticket.

Explanation

Correct Answer

B:

This handoff preserves the required corrective action and the verifiable service outcome. Cisco inventory output exposes product and serial identifiers for chassis and FRUs. Recording that chassis PID, serial and relevant module identities match the replacement ticket makes the signoff testable.

Incorrect Answers

A:

Delivery paperwork describes logistics, not recovered functionality. “Use the interface description field as manufacturer PID evidence” leaves the technical requirement and its validation unresolved.

C:

A future incident is not a reasonable acceptance gate for a known problem. “Infer the serial number from the connected VLAN ID” is not evidence that chassis PID, serial and relevant module identities match the replacement ticket.

D:

This proposes a different action with no acceptance evidence. “Trust the hostname as the unique chassis serial number” cannot replace the validated measure that chassis PID, serial and relevant module identities match the replacement ticket.

Question 141

Customer branch-site maintenance. Field report: A replacement phone boots but receives the wrong extension. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Apply “Assume identical phone models always receive identical extensions” as a substitute and declare success from shipment receipt alone.
  2. Close after recording “Change campus BGP AS number to select a phone extension” without checking that the intended extension appears and inbound/outbound call tests pass.
  3. Perform or retain the approved action: check the device record, line assignment and approved provisioning in call control; document evidence that the intended extension appears and inbound/outbound call tests pass.
  4. Defer service verification after “Erase the entire UCM cluster to reassign one line” until the next reported incident.

Explanation

Correct Answer

C:

This handoff preserves the required corrective action and the verifiable service outcome. A handset's endpoint identity and assigned directory numbers are centrally managed. Recording that the intended extension appears and inbound/outbound call tests pass makes the signoff testable.

Incorrect Answers

A:

Delivery paperwork describes logistics, not recovered functionality. “Assume identical phone models always receive identical extensions” leaves the technical requirement and its validation unresolved.

B:

This proposes a different action with no acceptance evidence. “Change campus BGP AS number to select a phone extension” cannot replace the validated measure that the intended extension appears and inbound/outbound call tests pass.

D:

A future incident is not a reasonable acceptance gate for a known problem. “Erase the entire UCM cluster to reassign one line” is not evidence that the intended extension appears and inbound/outbound call tests pass.

Question 142

Primary data-center night shift. Field report: A replacement conference room device passes power-on only. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm only that the work ticket says “completed,” without testing endpoint return-to-service.
  2. Confirm only that the technician attempted: use only the courier's rma delivery confirmation as a functional test.
  3. Confirm the site inventory list still contains the hostname, without validating the reported service.
  4. Demonstrate that end users can complete the designated test meeting with full media.

Explanation

Correct Answer

D:

End users can complete the designated test meeting with full media. Collaboration endpoint acceptance requires actual media function and provisioning.

Incorrect Answers

A:

Check whether end users can complete the designated test meeting with full media.

B:

For example, “Use only the courier's RMA delivery confirmation as a functional test” does not demonstrate the corrected technical state.

C:

Confirm that end users can complete the designated test meeting with full media.

Question 143

Headquarters wiring-closet visit. Field report: A damaged meeting-room video endpoint is swapped after documented asset approval. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Demonstrate that room call control, video, microphone and speaker paths operate.
  2. Confirm only that the work ticket says “completed,” without testing video endpoint replacement.
  3. Confirm only that the technician attempted: treat an optical link led as proof of working microphones and camera.
  4. Confirm the site inventory list still contains the hostname, without validating the reported service.

Explanation

Correct Answer

A:

Room call control, video, microphone and speaker paths operate. Video endpoint recovery includes provisioning and media components, not just electrical power.

Incorrect Answers

B:

Check whether room call control, video, microphone and speaker paths operate.

C:

For example, “Treat an optical link LED as proof of working microphones and camera” does not demonstrate the corrected technical state.

D:

Confirm that room call control, video, microphone and speaker paths operate.

Question 144

Colocation site RMA handoff. Field report: A chassis I/O module must be replaced while blades are serving workloads. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm only that the work ticket says “completed,” without testing ucs iom module.
  2. Demonstrate that the module is inventoried and server interface paths recover.
  3. Confirm the site inventory list still contains the hostname, without validating the reported service.
  4. Confirm only that the technician attempted: disconnect both fabric paths without checking workload impact.

Explanation

Correct Answer

B:

The module is inventoried and server interface paths recover. UCS chassis modules connect blades to fabric interconnect paths.

Incorrect Answers

A:

Check whether the module is inventoried and server interface paths recover.

C:

Confirm that the module is inventoried and server interface paths recover. UCS chassis modules connect blades to fabric interconnect paths.

D:

For example, “Disconnect both fabric paths without checking workload impact” does not demonstrate the corrected technical state.

Question 145

Remote office replacement window. Field report: An upgrade fails when the image cannot be fully stored in bootflash. Which action is the most defensible first step?

  1. Resize the uplink VLAN to expand flash memory.
  2. Delete all active boot packages without a rollback plan.
  3. Check free space and remove only explicitly approved obsolete files.
  4. Change NTP time to increase storage capacity.

Explanation

Correct Answer

C:

A valid image needs sufficient compatible local storage and a safe fallback. The action should lead to evidence that enough storage exists for the complete image and rollback data.

Incorrect Answers

A:

Attempting this shortcut is not an adequate substitute for the required action. A valid image needs sufficient compatible local storage and a safe fallback. Post-change evidence is still needed.

B:

This alternative would not solve the reported problem. A valid image needs sufficient compatible local storage and a safe fallback. The field team must instead establish whether enough storage exists for the complete image and rollback data.

D:

That change addresses a different aspect of the environment and leaves this requirement unresolved: an upgrade fails when the image cannot be fully stored in bootflash. The relevant control is check free space and remove only explicitly approved obsolete files.

Question 146

Disaster-recovery facility inspection. Field report: A field technician must handle a bare supervisor module near static-prone rack carpet. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Defer service verification after “Remove chassis earth bonding to isolate the work area” until the next reported incident.
  2. Apply “Use a cable tie around the wrist instead of a rated ESD strap” as a substitute and declare success from shipment receipt alone.
  3. Close after recording “Touch exposed components after rubbing clothing to neutralize static” without checking that ESD strap connection and antistatic surface meet the platform procedure.
  4. Perform or retain the approved action: attach an approved esd wrist strap to the designated grounded point before handling the module; document evidence that ESD strap connection and antistatic surface meet the platform procedure.

Explanation

Correct Answer

D:

This handoff preserves the required corrective action and the verifiable service outcome. Electrostatic discharge can damage sensitive modules; the approved ground path controls accumulation. Recording that ESD strap connection and antistatic surface meet the platform procedure makes the signoff testable.

Incorrect Answers

A:

A future incident is not a reasonable acceptance gate for a known problem. “Remove chassis earth bonding to isolate the work area” is not evidence that ESD strap connection and antistatic surface meet the platform procedure.

B:

Delivery paperwork describes logistics, not recovered functionality. “Use a cable tie around the wrist instead of a rated ESD strap” leaves the technical requirement and its validation unresolved.

C:

This proposes a different action with no acceptance evidence. “Touch exposed components after rubbing clothing to neutralize static” cannot replace the validated measure that ESD strap connection and antistatic surface meet the platform procedure.

Question 147

Main campus hardware-service ticket. Field report: A UCS server has two configured virtual NIC paths but one fabric fails. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Perform or retain the approved action: validate fabric redundancy and active server vnic/vhba placement before return to service; document evidence that expected traffic survives an approved single-fabric test.
  2. Apply “Disable the surviving fabric to make both NICs symmetrical” as a substitute and declare success from shipment receipt alone.
  3. Defer service verification after “Change all guest TCP ports rather than checking adapter paths” until the next reported incident.
  4. Close after recording “Assume dual virtual NICs guarantee separate hardware paths without checking mapping” without checking that expected traffic survives an approved single-fabric test.

Explanation

Correct Answer

A:

This handoff preserves the required corrective action and the verifiable service outcome. Logical adapters provide resilience only when mapped to appropriate independent physical fabrics. Recording that expected traffic survives an approved single-fabric test makes the signoff testable.

Incorrect Answers

B:

Delivery paperwork describes logistics, not recovered functionality. “Disable the surviving fabric to make both NICs symmetrical” leaves the technical requirement and its validation unresolved.

C:

A future incident is not a reasonable acceptance gate for a known problem. “Change all guest TCP ports rather than checking adapter paths” is not evidence that expected traffic survives an approved single-fabric test.

D:

This proposes a different action with no acceptance evidence. “Assume dual virtual NICs guarantee separate hardware paths without checking mapping” cannot replace the validated measure that expected traffic survives an approved single-fabric test.

Question 148

Regional north-campus service window. Field report: A data hall needs high-speed Ethernet server and fabric switching. A colleague proposes: “Use Cisco MDS Fibre Channel only as the sole Ethernet leaf switch.” Which technical assessment is best supported?

  1. The proposed shortcut is sufficient because replace the server nic with an ip phone as a fabric spine.
  2. The proposal overlooks the reported dependency: Cisco Nexus platforms are used for data center Ethernet switching.
  3. The original problem can be treated as resolved from inventory labels alone, without checking nexus product role behavior.
  4. There is no need to validate the reported dependency once use a home wi-fi extender for the rack fabric.

Explanation

Correct Answer

B:

The alternative does not address the actual reported dependency. Cisco Nexus platforms are used for data center Ethernet switching. The supported intervention is select cisco nexus switching appropriate to the data center ethernet fabric; acceptance should show that fabric ports and servers link through the planned Nexus topology.

Incorrect Answers

A:

The proposed step “Replace the server NIC with an IP phone as a fabric spine” is not the required mechanism.

C:

The failure described in the field report requires a functional check that fabric ports and servers link through the planned Nexus topology.

D:

It assumes an unrelated action establishes service recovery. Nothing about “Use a home Wi-Fi extender for the rack fabric” demonstrates whether fabric ports and servers link through the planned Nexus topology.

Question 149

Customer branch-site maintenance. Field report: A Cisco 8000 router receives a high-density line-card spare with a specific fabric requirement. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm the site inventory list still contains the hostname, without validating the reported service.
  2. Confirm only that the technician attempted: assume access-switch stacking rules apply unchanged to the 8000 family.
  3. Demonstrate that slot, fabric, card and interface status are healthy.
  4. Confirm only that the work ticket says “completed,” without testing cisco 8000 module mapping.

Explanation

Correct Answer

C:

Slot, fabric, card and interface status are healthy. Large modular router families require documented line-card/fabric compatibility.

Incorrect Answers

A:

Confirm that slot, fabric, card and interface status are healthy. Large modular router families require documented line-card/fabric compatibility.

B:

For example, “Assume access-switch stacking rules apply unchanged to the 8000 family” does not demonstrate the corrected technical state.

D:

Check whether slot, fabric, card and interface status are healthy. Large modular router families require documented line-card/fabric compatibility.

Question 150

Primary data-center night shift. Field report: A desk phone has link but no network address after a wiring closet change. A colleague proposes: “Change the upstream UCS storage zoning before phone address checks.” Which technical assessment is best supported?

  1. The original problem can be treated as resolved from inventory labels alone, without checking voice access path behavior.
  2. There is no need to validate the reported dependency once assume physical link alone guarantees voice signaling service.
  3. The proposed shortcut is sufficient because replace the call-control cluster before confirming vlan reachability.
  4. The proposal overlooks the reported dependency: Endpoint voice service depends on correct network access and addressing.

Explanation

Correct Answer

D:

The alternative does not address the actual reported dependency. Endpoint voice service depends on correct network access and addressing. The supported intervention is check switch access, voice vlan, power and dhcp for the phone; acceptance should show that a valid voice address and registration once edge service is restored.

Incorrect Answers

A:

The failure described in the field report requires a functional check that a valid voice address and registration once edge service is restored.

B:

It assumes an unrelated action establishes service recovery. Nothing about “Assume physical link alone guarantees voice signaling service” demonstrates whether a valid voice address and registration once edge service is restored.

C:

The proposed step “Replace the call-control cluster before confirming VLAN reachability” is not the required mechanism.