Question 370
During an enterprise migration readiness test focused on ip sla policy interpretation, an engineer documents: A static route remains installed even when an IP SLA track is down because the route lacks track reference. Which option correctly addresses it?
Explanation
Correct Answer
Associate the route with the intended tracking object. A standalone SLA does not automatically remove an unrelated static route.
Incorrect Answers
Use an appropriate application/transport-level test in addition to ICMP belongs to a different case: An IP SLA ICMP echo succeeds but the application still fails on TCP port 443. ICMP reachability alone does not prove TCP service availability.
Tune track delay or hysteresis parameters carefully is designed for this other requirement: A failover trigger flaps during momentary loss and changes routes too frequently. Threshold and delay policies can reduce transient failover churn.
Apply a tracking reaction suitable for the required threshold behavior is not the precise answer here. It addresses: An SLA response-time threshold is exceeded but reachability is not wholly lost.