Question 440
A logistics planner receives a proposed delivery schedule that omits the warehouse closure. What acceptance evidence would demonstrate that the result is trustworthy?
Explanation
Correct Answer
A successful draft or configuration is not itself proof. Compare each delivery window against signed receiving hours and dock booking capacity checks the actual outcome; schedule accuracy means satisfying external operational constraints, not only appearing sequential.
Incorrect Answers
Proposed check: Re-evaluate the plan against operating calendars and capacity limitations. This specifies a plan, not a measured result showing an improved workflow.
Proposed check: Require dispatch-owner approval before communicating a schedule as confirmed. A continuing guardrail cannot replace an observed acceptance criterion.
Proposed check: Identify dates that fall on the published closure or overrun available loading slots. Finding the likely error source does not establish that the correction worked.